Krowodrza, Salwator, Bolesława Prusa
Ultra-selective | Spectacular interior heights
UNIQUE RESIDENTIAL APARTMENT NEAR BŁONIA PARK IN KRAKOW
The only apartment for sale | Top floor | Ceiling height up to 4.63 m | Quiet luxury | Roof terrace
*****
ROOM LAYOUT:
* Living area: 60.65 m², height nearly 5 m,
* bedroom I: 13.58 m², height 310 cm,
* bathroom I: 7.71 m², height 280 cm,
* bedroom II: 15.59 m², height 310 cm,
* master bedroom: 18.48 m², height 310 cm,
* master dressing room: 3.61 m², height 310 cm,
* master bathroom: 4.98 m², height 280 cm,
* stairs with a landing on the mezzanine and a terrace of 8.90 m².
Additionally, it is possible to build a mezzanine for individual arrangement (additional approx. 16 m²), ideal as a private library, study or second living room, further increasing the usable area of the apartment.
The apartment offers 4 rooms, including 3 full-size bedrooms and 2 full bathrooms, including a master suite with a walk-in closet and a private bathroom.
The apartment offers private access to the roof of the building.
It is possible to design a terrace of nearly 140 m² according to the buyer’s individual preferences. Winter garden, private SPA area with gym.
The possibilities are endless.
STANDARD:
The investment is the essence of quiet luxury—without ostentation, without marketing hype, but with an absolute focus on quality.
* Natural stone, wood, and aluminum,
* Aluminum window frames with above-standard heights,
* Modern, bold architectural form,
* Highest standard of workmanship in common areas,
* World-class design, created as a private residence rather than a market product.
LOCATION:
Prusa Street is one of the most prestigious addresses in Krakow, directly adjacent to Błonia Park.
The Nobu Hotel Krakow, an ultra-luxurious hotel of a global brand, is being built in the immediate vicinity, which clearly confirms the international status of the location and its long-term value.
ADDITIONAL INFORMATION:
* 2 parking spaces in the underground garage: PLN 200,000 each.
* Start of construction: March 2026.
* Completion of the investment: March 2028.
Feel free to contact me!